Borewell Meter Stopped Transmitting: Does It Put Your Groundwater Permission at Risk?

Quick answer: Yes, it can. Your groundwater NOC requires a digital water flow meter with telemetry on every borewell, and the CGWA guidelines of 24 September 2020 list a penalty of Rs 2,00,000 for a meter with telemetry that is not installed or is faulty. Most telemetry failures come from the SIM, power, data logger, […]
Factories in Delhi’s Industrial Areas: Which Chimneys Now Need Live Online Data?

Quick answer: In Delhi, a chimney needs live online emission data if the unit falls in a category named in CPCB’s direction dated 12 January 2026: the 17 highly polluting categories, common facilities and incinerators, medium and large red category units, and food, metal and textile units. Food, metal, and textile units also need a […]
NEVCO at AFR 2026: Sustainable Cement & Emissions

NEVCO’s role at AFR 2026: advancing sustainable cement through alternative fuels, emissions monitoring, and precision process instrumentation.
What Emission Limits Apply to Your Boiler Stack? An Industry-Wise Standards Guide

Quick answer: For most industrial boilers in India, the national limit is for particulate matter (PM): 500 mg/Nm³ below 2 t/h, 150 mg/Nm³ (or 250 for agro fuels) from 2 to under 10 t/h, and 100 mg/Nm³ (or 250 for agro fuels) at 10 t/h and above, corrected to 6% O2 for solid fuel and […]
Which Stack Analysers Are Actually Allowed to Send Data to the Government Server in NCR?

Quick answer: In NCR, only stack analysers certified by CSIR-NPL may send data to the CPCB server. CPCB made this mandatory for all air-polluting industries in NCR on 25 November 2025, when 21 OCEMS models were on the certified list. The list is updated from time to time, so check the exact model against CPCB’s […]
Got a Closure Notice for Missing Online Data? What to Do in the Next 15 Days

Quick answer: If you have received a closure notice for missing OCEMS data, restore live data to the CPCB and SPCB servers first, then document every step. Within 15 days, file an action taken report with evidence, a self-certificate, and your registration details. These steps strengthen your response, but the board alone decides on revocation. […]
Registered on the Old Portal? Why Your Plant Could Still Face Closure After ODAMS

Quick answer: Being registered on CPCB’s old OCEMS portal is no longer enough. CPCB’s new portal, ODAMS (cems.cpcb.gov.in), went live on 31 August 2025, and every industry with OCEMS must register on it and send data directly, without a third-party forwarder. In January 2026, CPCB listed units still on the old portal and directed closure […]
Energy Efficiency Summit 2026: Day 2 Highlights

Day 2 insights from the Energy Efficiency Summit 2026 in Hyderabad, focusing on CEMS, ambient air quality, and smart industrial monitoring.
Day 1 Highlights at Energy Efficiency Summit 2026

Discover Day 1 insights from the Energy Efficiency Summit 2026, featuring emission monitoring, ambient air quality, and energy-saving industrial solutions.
SO2 measurement ( 0-20%) in Sulfuric Acid Production Plant

The process control of a sulfuric acid plant needs good and reliable detection of gas phase SO2. To measure SO2 can be a challenge due to the corrosive environment and high concentration of SO2. Several places in the process needs to be monitored and to transport the sample gas is difficult. A large dynamic range […]